////////iPad Pro mouse disable
read
more

n

n

e

e

w

w

s

s

Green powered mobilization of Offshore Supply Vessel in M4H

Starting of with an engineering scope of a seafastening design of a walk to work system on board an offshore supply vessel. Followed by the deck layout sea fastening and engineering scope of the client.

And finally providing engineering, procurement, construction and installation solutions on a turn key basis using our own warehouse and quay facilities in Merwe4haven (M4H).

Most of our installation and fabrication services are using our own generated solar power, providing 400,000 kWh annually.

Photography RR/Linda de Leur

back to all news
right arrowright arrow