////////iPad Pro mouse disable
read
more

n

n

e

e

w

w

s

s

Feasibility study for retrofit BWTS on Ultra Large Container Vessel

Recently UniBallast carried out a feasibility study for the installation of an UV system to treat ballastwater on an ULCV. Scanning and inspection was done in the Middle East, while modelling, basic engineering and reporting was done in our office in the Netherlands using AVEVA E-3D software. Typical lead time for a feasibility study including 3D scanning and engineering is 2-3 weeks. If the basic design package has been approved by Client and Class a detailed engineering package will be made.

back to all news
right arrowright arrow